banner
Home > Knowledge > Content

What should we pay attention to when installing seamless video wall

- May 26, 2022-

When installing the video wall, there are some matters that need to be paid attention to, such as the installation ground, wiring, ambient light, Tonggang requirements, etc. the installation ground selected for the video wall should be flat, because the volume and weight of the whole system of the seamless video wall are large, and the selected ground also needs to have a certain weight bearing capacity;

18

 In addition, the installation ground should be anti-static. When installing the LCD seamless video wall, pay attention to distinguish the power line from the signal line and install it in different places to avoid interference. In addition, according to the size and installation position of the screen of the whole project, calculate the length and specifications of various lines required, and calculate the needs of the whole project. The brightness of the video wall is high, but it is limited after all. Therefore, in terms of ambient light, pay attention to that the light around the selected installation environment should not be too strong, and the light that can be emitted near the screen should be blocked if necessary. Downlights should not be installed directly in front of the screen. 4 In order to facilitate the maintenance of the video wall, the removable binding shall be selected for the frame binding. About 25mm gap shall be reserved between the inner edge of the outer frame and the outer edge of the splicing wall, and the allowance shall be appropriately increased for the large splicing wall according to the number of columns. In addition, in order to enter the maintenance of the box in the later stage, the maintenance channel shall not be less than 12m in principle, and the removable edge strip should be pressed against the edge of the screen. After the box and the screen are completely installed in place, the removable edge strip shall be fixed at last. In the maintenance channel, air conditioner or air outlet must be installed to ensure good ventilation of the equipment. The air outlet shall be located as far away from the LCD video wall as possible, and the air at the air outlet shall not be blown directly against the box, so as to prevent the rabbit screen from being damaged due to uneven cold and heat.